Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | None |
Date time: | 9.28am, Friday 21st September, 2007 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | martin |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
On-site meeting regarding corrections to the East Road toucan crossing.
Comments reflect the views of the original submitter only.