Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bath |
Date time: | 12.23pm, Tuesday 21st July, 2020 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Bath |
The end of the Bath Linear Park (former railway, leading to NCN 244, the Two Tunnels route).
Comments reflect the views of the original submitter only.