Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | timelapsecambridgestationplatform |
Date time: | 11.58am, Friday 20th May, 2011 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
See #30253
Taken from the cycle bridge over the railway showing the recently lifted tracks ready for taking way to build the new platform.
This will be the new location for the photos in the time lapse sequence at cambridge.cyclestreets.net/galleries/187/
Comments reflect the views of the original submitter only.