Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cycleway, great, kneighton |
Date time: | 2.40pm, Sunday 9th June, 2013 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Area: | Cambridge |
Pavement ends, now join the 40mph Addenbrookes Access Road.
Comments reflect the views of the original submitter only.