Category: | Cycleway: An example of good practice |
Tags: | bath, ncn244, tunnel, twotunnels |
Date time: | 11.30am, Tuesday 27th September, 2016 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | simon |
Copyright: | Public domain |
Download: | View full-size original |
Area: | Bath |
Eastern end of the 400m tunnel on the Two Tunnels Greenway.
Comments reflect the views of the original submitter only.